Old 09-02-2018, 10:37 AM   #1
bangy1
Sponge Jockey
 
Join Date: Jul 2016
Posts: 30
Thanks: 0
Thanked 3 Times in 3 Posts
How long to leave paint before coating?

Hi, not sure if this is the right sub forum or not so feel free to shift it....

I had a fireball ceramic coating applied to my car a few months ago however since then some nice person marked the rear quarter panel on it meaning it needed painting which was completed to a good standard on Tuesday.

How long should I wait before getting the coating re-applied to here ideally as I have heard 2 weeks or so all the way up to 4 months as the paint needs time to "gas"? I am keen to get it back on asap but don't want issues later on by being too trigger happy so any advice is appreciated.
bangy1 is offline   Reply With Quote
Old 09-02-2018, 06:34 PM   #2
SamD
PC Perfectionist
 
Join Date: Oct 2015
Posts: 307
Thanks: 57
Thanked 162 Times in 96 Posts
Most people would advise 90 days before reapplying any coating
SamD is offline   Reply With Quote
Old 09-02-2018, 10:50 PM   #3
bangy1
Sponge Jockey
 
Join Date: Jul 2016
Posts: 30
Thanks: 0
Thanked 3 Times in 3 Posts
Ah ok as long as that? Oh well better to be safe than sorry
bangy1 is offline   Reply With Quote
Old 10-02-2018, 06:34 PM   #4
Barbel330
Washmitt Meister
 
Barbel330's Avatar
 
Join Date: May 2016
Location: Hertfordshire
Posts: 134
Thanks: 9
Thanked 79 Times in 55 Posts
I've experimented recently with this. Painted some brembo brake calipers and coated them the following day with Gtechniq C5 and it's been absolutely fine. I've also done it on small pieces of my vehicle which I've freshly painted, mirror covers, side skirts and a rear bumper which I repaired, again no ill affects. Ive seen zero gassing problems whatsoever. I suppose I'd advise to leave it as long as you can but it wouldn't worry me to do it much sooner than 90 days. I think that's one of these myths which somebody once said and everybody else now repeats.
Barbel330 is offline   Reply With Quote
Old 13-02-2018, 02:20 AM   #5
peterboy
Sponge Jockey
 
Join Date: Jun 2013
Posts: 62
Thanks: 6
Thanked 14 Times in 13 Posts
It can take a long very time to see the ill effects. Things like solvent pop can show up months even years later.
peterboy is offline   Reply With Quote
The Following User Says Thank You to peterboy For This Useful Post:
chongo (13-02-2018)
Old 13-02-2018, 03:14 AM   #6
macca666
OCD Sufferer (Obsessive Car Detailer)
 
macca666's Avatar
 
Join Date: Mar 2010
Location: Ayrshire
Posts: 2,559
Thanks: 2,022
Thanked 1,947 Times in 1,168 Posts
Garage
Quote:
Originally Posted by peterboy View Post
It can take a long very time to see the ill effects. Things like solvent pop can show up months even years later.
Not disagreeing with your statement as i cant answer the OP question however if the likes of solvent pop does take years to show up how can you attribute it to something you did years previously? i.e. how can you attribute it to applying a coating and not something the bodyshop did?
macca666 is offline   Reply With Quote
Old 13-02-2018, 08:02 AM   #7
SystemClenz
DW Supporter
 
SystemClenz's Avatar
 
Join Date: Oct 2008
Location: Weston Super Mare / Portishead
Posts: 3,402
Thanks: 1,182
Thanked 1,652 Times in 1,104 Posts
Most coatings are gas permeable so you can apply a coating straight away, we just allow 72 hours and have re-coated many cars this way with no problems, hope this helps
__________________
System Clenz Ltd, Est 2006
Weston Super Mare
- Gtechniq Accredited Detailer
Facebook - Twitter - Website - Instagram - Email Us
SystemClenz is offline   Reply With Quote
Old 13-02-2018, 10:15 AM   #8
Mikesphotaes
Orbital Oracle
 
Mikesphotaes's Avatar
 
Join Date: Jul 2016
Posts: 655
Thanks: 391
Thanked 282 Times in 251 Posts
Garage
There was a thread on here about how long to wait before waxing new paint and the same old gassing question came up.

I have had a few bits of my car repainted and was told to wait 3 days before waxing.

I waited a week each time and have had no problems whatsoever and the first time was a couple of years ago.
Mikesphotaes is offline   Reply With Quote
Old 13-02-2018, 01:55 PM   #9
bangy1
Sponge Jockey
 
Join Date: Jul 2016
Posts: 30
Thanks: 0
Thanked 3 Times in 3 Posts
Hi thanks all for the replies as in the past I have been told to hold off waxing etc. for a few days until the paint settles.

I also did see that the Gtechniq guys say 72 hours but wasn't sure if this was the same for the fireball coatings.

The car will be getting the painted parts re-coated in a few weeks as things stand which will have gave it 5 weeks since painting.
bangy1 is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 12:44 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.
DTO Garage vBulletin Plugins by Drive Thru Online, Inc.

vB.Sponsors
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.
DTO Garage vBulletin Plugins by Drive Thru Online, Inc.

vB.Sponsors