Hi all, I’m planning on doing my yearly protection detail tomorrow. Temps look like it will drop overnight to just above freezing, so I’ve bought Gyeon Cure as a topper for Cancoat, as the car will be left outside overnight.
My question is: How Long after applying Cancoat should wait before I apply Cure?
I’d like to put it on as soon as possible, due to the amount of pollen that will be sitting on the paint if I leave it too long
My question is: How Long after applying Cancoat should wait before I apply Cure?
I’d like to put it on as soon as possible, due to the amount of pollen that will be sitting on the paint if I leave it too long